DISPATCH LIVE · 06:00–18:00
TODAY'S BATCHES47AVG PSI DELIVERED4,250TRUCKS DISPATCHED12
Stats-First. Proof Before Promise.

Concrete that
shows up.

Ready-mix delivered to your forms before the window closes. Certified PSI, dispatched at 6 AM, every batch logged.

184,320yd³

Cubic Yards Poured This Year

and counting — updated daily

38min

Average Delivery Window

99.2%

Batches Meeting Spec on First Test

Proof Numbers · Year to Date · 2026
0yd³

Cubic yards poured this year

0min

Average delivery window

0.0%

Batches meeting spec on first test

0PSI

Average compressive strength delivered

Mix Design Catalog

Right mix.
Every pour.

Download Full Spec Sheet
SL-3000

Standard Flatwork

3,000PSI

Driveways, sidewalks, residential slabs

Slump

4–5 in

W/C Ratio

0.50

Air

5–7%

ResidentialFlatworkDOT Approved
FD-4000

Foundation Grade

POPULAR
4,000PSI

Commercial footings, basement walls, grade beams

Slump

4–6 in

W/C Ratio

0.45

Air

4–6%

CommercialFoundationIBC Compliant
ST-5000

Structural High-Strength

5,000PSI

Bridge decks, columns, post-tensioned slabs

Slump

3–5 in

W/C Ratio

0.40

Air

4–5%

MunicipalBridgeAASHTO M85
SD-6000

Storm Infrastructure

6,000PSI

Storm drains, culverts, retaining walls

Slump

3–4 in

W/C Ratio

0.38

Air

3–5%

MunicipalDOT SpecSulfate Resistant
IC-3500

Interior Slab

3,500PSI

Warehouse floors, tilt-up panels, podium decks

Slump

4–6 in

W/C Ratio

0.48

Air

3–4%

IndustrialFlatworkFiber Available
Field Reports

GCs don't lie
about pour windows.

4.9 / 5.0 · 340+ projects

"We poured 2,400 yards on a 14-day schedule for a parking structure in downtown Phoenix. Batch had trucks staged at 5:50 AM every single day. Not one missed window."

Marcus Delgado, VP Operations at Delgado & Sons General Contracting

Marcus Delgado

VP Operations · Delgado & Sons General Contracting

6-story parking structure · 2,400 yd³ · 4,000 PSI

"The storm drain spec required sulfate-resistant mix at 6,000 PSI. Batch's SD-6000 hit 6,340 on 28-day compression. DOT inspector signed off same afternoon."

Renata Kowalski, Senior Civil Engineer at Maricopa County Department of Transportation

Renata Kowalski

Senior Civil Engineer · Maricopa County Department of Transportation

SR-101 drainage expansion · 880 yd³ · 6,000 PSI

"Tight residential neighborhood, 30-minute pour window before the neighbors called code. Batch coordinated three trucks in sequence. Clean, on time, zero callbacks."

Tom Nguyen, Owner at Nguyen Custom Builders

Tom Nguyen

Owner · Nguyen Custom Builders

Residential foundation · 48 yd³ · 3,500 PSI

"Bridge deck pour during monsoon season. Batch had the mix adjusted for ambient temperature before I even asked. That's the kind of operation you want on a DOT project."

Carla Okonkwo, Project Manager at Southwest Infrastructure Group

Carla Okonkwo

Project Manager · Southwest Infrastructure Group

I-10 overpass deck · 1,100 yd³ · 5,000 PSI
Get a Pour Quote

Tell us what
you're pouring.

Zip code first — we confirm your service area immediately. Most quotes are ready within 2 hours.

We serve a 60-mile radius from our Phoenix plant

Dispatch Status · Live

Trucks Active

12

of 14

Avg ETA Today

34

min

Batches Today

47

poured

Plant Status

OPEN

5AM–6PM

Download Mix Design Spec Sheet

Full technical data for all 12 mix designs — PSI curves, aggregate gradation, admixture schedules, and DOT approval numbers.

ACI 318 Certified

GPS Fleet Tracking

DOT Approved Mixes